Skip to Main Content

Kings Island

Kings Island announces important updates regarding the rest of the 2020 Season. Learn More.

Skip to Next Section

On this day 40 years ago, testing of The Beast began

Don Helbig

Area Manager Digital Marketing - Kings Island

Twitter: @DonHelbig 

  

On this day 40 years ago, on a rainy afternoon, six engineers, 17 technicians, 53 construction workers, four managers, one general manager and 33 assorted involved people, watched as The Beast roller coaster’s gleaming red 2,700-pound car was placed carefully on the untested tracks.

The first test of The Beast at Kings Island was beginning and the mission was to get the car to return.

About to be judged were three and one-half years of planning, 30 months of studying the world’s best roller coasters, 4,300 man-hours of precise design work to limit all tolerances down to less than 1/16 of an inch, 87,000 man-hours of construction work, a computerized safety system, the investment of $3.8 million and the anticipated thrills of literally millions of guests.

The Beast had already been acclaimed the world’s ultimate roller coaster by industry experts and roller coaster enthusiasts. But, despite all the engineering, planning and design, its record-breaking hills (the two longest vertical drops in the world at the time), its eight banked turns including a 540-degree helix, its length of 7,359 feet, three underground tunnels and its rugged natural terrain, everyone was anxiously waiting for The Beast car to return. It’s not hard to imagine what the mood on the station platform was like with all that was at stake for the park.

A little over four minutes later, The Beast car made a successful return, much to the delight (and relief) of everyone watching. Later in the day, a complete train of four cars was tested, loaded with sand bags to approximate the weight the car might have if loaded with 32 riders. After another successful test run, it was clear that whatever Al Collins and Jeff Gramke had done in their first foray into designing a wooden roller coaster, they did it right!

"One of the biggest pride factors for me when we first ran the ride was to see the reaction of Al Collins," said Gramke, who now serves as Kings Island's manager of facilities, engineering and construction. "Al Collins was a very dry, not real emotional kind of guy. For him to be the major designer of this mega roller coaster and not wanting any credit for having done that, he actually got excited and tears came to his eyes when that thing went around. To see that and having worked with that man for all those years (since 1971), that was a great excitement for me too."

After nine days of testing, The Beast was ready to be “unchained” for hundreds of media representatives from around the U.S. and Great Britain on April 13, 1979.

 

 

Share This

Don Helbig

Area Manager Digital Marketing - Kings Island

Twitter: @DonHelbig 

  

Post a Comment

Skip to Next Section

Kings Island Foodie News: Nebula Chill now available for a limited time only 

This week, Kings Island’s culinary team introduced its newest product, the Nebula Chill. Sounds refreshing, right? You’ll need to hurry. The Nebula Chill is available for a limited time only.
Read More

Kings Island offers unique shopping experiences 

In the Emporium gift shop located on International Street at Kings Island, you'll find unique shopping experiences. From apparel and toys, to embroidered hats, to mini Eiffel Towers, glassware and NanoCoasters, you can always remember your day and fun and thrills at the park.
Read More

Kings Island launches new 4K Cinematic YouTube Series

Knowing that there are people who would rather watch than ride, this sparked the idea for a new series exclusive to Kings Island’s YouTube channel. The new 4K Cinematic Series will compile only the best views and sound bytes of your favorite park areas and attractions.
Read More

This date in 2016: Mystic Timbers revealed at Kings Island 

On this date in 2016, after 10 weeks of in-park clues and social media teasing, Kings Island revealed its plans to build a new wooden roller coaster: Mystic Timbers.
Read More

Celebrate the 10th anniversary of Boo Blasters on Boo Hill at Kings Island

For 10 years, visitors to Kings Island have had an opportunity to experience an interactive family attraction, Boo Blasters on Boo Hill. It’s a ride that guests of all ages enjoy riding over and over again.
Read More

Kings Island Foodie News: Chicken Sandwich added to Chicken Shack menu

The Kings Island culinary team is excited over its newest product offering. Beginning today (July 26), the Chicken Shack restaurant in Action Zone will offer a new Chicken Sandwich.
Read More

Check out this sunrise from Orion at Kings Island 

To end the week, we’re sharing this amazing look at the bright sun rays rising from behind the new Orion giga coaster to usher in a new day of fun and thrills at Kings Island.
Read More

Today is National Carousel Day! 

Good morning! Guess what day it is? It’s National Carousel Day, also known as National Merry-Go-Round Day.
Read More

Kings Island Foodie News: The Celestial Sausage is now available for a limited time

With the new Meteor Canteen Consumption Station opening in Area 72, Kings Island’s culinary team has created a very special menu item: The Celestial Sausage, a Blueberry Spinach Chicken Sausage served on top of Leafy Greens and finished with Tarragon Ranch.
Read More

Floral Clock an iconic Kings Island attraction

The most iconic and most photographed landscape feature at Kings Island is the floral clock. When it was built in 1972, it was the world’s largest and heaviest clock mechanism.
Read More